Tirupati Cement Products offers Engineering, Procurement, Construction, Installation, Commissioning of pipeline including Mechanical and Electrical Equipment & Operation & maintenance for water supply and work for WTP and Pumping Stations

Projects

2018-12-10

Main for the corridor / influence zone.

Shifting of Water and Effluent Main from Pragati Maidan Gate No.7 to 3, DPS and Sundar Nagar at Mathura road and Gas Turbine Power Station to MCD Nallah, Ring road for construction of Integrated Transit corridor development and street Network / connectivity Plan for the corridor / influence zone.

Under Execution

2018-02-07

Balance Water Distribution Network of the North Zone Guwahati.

Procurement of Works (Item rate) for Supply and Installation of Pipe and Fittings and Installation of the Employer furnished D.I Pipes for the balance Water Distribution Network of the North Zone.

Under Execution

2016-07-23

Replacement of 1000mm dia PSC Water main from Prasant Vihar to Peera Garhi.

Replacement of 1000mm dia PSC Mangol Puri water main from Prasant Vihar Red light to Peera Garhi UGR.

Under Execution

2016-05-09

Replacement of left out portions of Pitampura and North-West main

Replacement of left out portions of Pitampura and North-West main from Haiderpur WTP-I to MU Block Pitampura UGR and OHT Pushpanjali Enclave.

Under Execution

2017-08-29

agar including 5 year O&M after one year DLP.

Supply, Laying, Testing and Commissioning of Rising main of capacity 10 MGD and other contingent works including all piping, electrical, mechanical & instrumentation works from WTP village Sinhpur to various water works/UGRs located at various locations in New Chandigarh, Mullanpur, SAS Nagar including 5 year O&M after one year DLP.

Under Execution

2014-08-14

Installation of Tube Wells at Bhagirathi WTP and other suitable locations for augmentation of water supply.

Installation of Tube Wells at Bhagirathi WTP and other suitable locations for augmentation of water supply.

Under Execution

2014-05-02

P/L 800 mm dia rising main and sump well for carriage of treated effluent from STP Kondli to Smirti van/lake

P/L 800 mm dia rising main including construction of sump well for carriage of treated effluent from STP Kondli to Smirti van/lake and for nearby DDA and MCD Parks.

Under Execution

2013-03-11

Execution of work of Pokaran Falsoond Balotra Siwana Water Supply Project Part-4A Cluster Distribution, internal village pipe distribution and Geo-Tagging along with construction of CWR and Pumping Stations and providing FHTCs in 180 villages of District Barmer etc. complete job including one year defect liability Period followed by Operation and Maintenance for 10 years of facilities executed up to Village Transfer Chambers under Jal Jeevan Mission.

Under Execution

2012-03-15

scheme (distribution mains) for Zone-III, U,E Gurgaon.

Providing, stringing out. Jointing cutting and testing of 1600mm i/d M.S pipe and stringing out jointing, cutting and testing of D.I pipes of 300mm to 1200mm i/d providing and fixing of sluice valves, construction of sluice valve haudies and all other works contingent thereto including A/Mtc for 3 years.

Satisfactorily Completed

2008-08-14

Providing master water supply scheme (distribution mains) for new sectors-58 to 115, (for Zone-IV to VIII)

Providing, stringing out, jointing, cutting and testing of 1600mm i/d & 1500 mm i/d M.S. pipe, providing and fixing of sluice valves, construction of sluice valve haudies and all other works contingent thereto." (including A/Mtc. for 3 years).

Satisfactorily Completed

2014-05-19

2000 mm dia Peripheral Sewer Line in Mitraon Goc

Providing, Laying, Jointing Internal and Peripheral Sewer LIne in Mitraon Goc and Part of Dichaon Goc under the Command of Mitraon STP

Sewage / Drainage

2014-08-07

Construction of 3.85 (MGD) WWPS Including Rising main at Yamuna Vihar

Construction of 3.85 (MGD) WWPS Including Rising main at Yamuna Vihar

Sewage / Drainage